The road to Narayan Sarovar in western Kutch is being rebuilt as a two lane highway with paved shoulders at ₹315.25 crore, and the Naliya Narayan Sarovar tender closes at 11:00 AM on 30 November 2026.
Design km 220.773 to km 288.987
That is just over 68 km of NH-41 between Naliya and Narayan Sarovar, upgraded to two lanes with paved shoulders on EPC mode with 730 days. Zone West of MoRTH issued it under reference RW/NH12014/03/2026GJ/ZONE-WEST on 14 May 2026.
This is the far western corner of Gujarat, close to the coast and the border. Traffic is light compared with the Kutch industrial belt, so the case for the upgrade is connectivity and strategic access rather than congestion. For a contractor that means a clean site with few utility clashes, which is worth real money.
Deposit, fee and the sibling package
EMD is ₹3,15,00,000 with no exemption and the tender fee is ₹40,000. The estimate stands at ₹3,15,25,00,000 and bids open at 11:30 AM on 1 December 2026. The same zone has a second Kutch package out on the next reference number, for the Chitrod Rapar Balasar section of NH-927C, closing the same day.
Bidding for both is possible, but the two sites are several hours apart across Kutch, so treat them as separate mobilisations when you price.
Remote site, self sufficient camp
Sixty eight kilometres at the end of the road means your camp has to be close to self sufficient. Carry spares, a workshop and a fuel plan. Excavators and tippers do the widening and shoulder work, motor graders and compactors build the layers, and a wheel loader runs the crusher and hot mix plant.
Cross drainage along a coastal alignment needs steady concrete, so plan transit mixers and a crane for the larger culverts. Machines going out there should be in good condition, because a breakdown costs days rather than hours.
Key facts
Tender ID
2026_MoRTH_908645_1
Reference no.
RW/NH12014/03/2026GJ/ZONE-WEST
Issuing authority
Ministry of Road Transport and Highways, P4 Delhi, Zone West
Location
Naliya Narayan Sarovar section of NH-41, design km 220.773 to km 288.987, Gujarat
What is the length of the Naliya Narayan Sarovar tender?
Just over 68 km, from design km 220.773 to km 288.987 of NH-41 in Kutch, Gujarat.
What standard is the road being built to?
Two lanes with paved shoulders, on EPC mode with a 730 day work period.
What are the bid terms?
₹315.25 crore estimate, ₹3,15,00,000 EMD with no exemption, and a ₹40,000 tender fee.
When is the deadline?
Bids close at 11:00 AM on 30 November 2026 and open at 11:30 AM on 1 December 2026.
Tender details are summarised for convenience and may change. Always verify the latest dates, terms and documents on the official tendering portal before bidding. DesiMachines is not responsible for changes made by the issuing authority.
Bidding with your own machines?Tenders often ask for machine papers such as the RC, insurance and invoice. Keep them in one private place on My Machine and get a reminder before insurance or service falls due. Free.
Desi Machines is a platform where you can see and compare construction equipment. It showcases images, brochures, features, technical specifications, brand details & dealer information. All these are taken from respective brand websites, brochures, and other public resources. We do not claim ownership of these materials and strive to ensure their accuracy. However, the disparity may happen and we advise users to verify directly with respective brands and dealers. Desi Machines is not liable for any inaccuracies or reliance on the information provided. Use of this website is at your own discretion.