Corridor 01 of the Patna Metro needs its ballastless track laid, buffer stops supplied and the rest of the permanent way fitted out, and the Patna Metro track tender closes at 03:00 PM on 28 December 2026.
DMRC tendering for Patna, on JICA terms
Delhi Metro Rail Corporation is the executing agency here, and the notice comes from its JICA tenders wing under reference PT-05. Scope is installation of ballastless track including supply of buffer stops and other items for Corridor 01 of the Patna Metro Rail Project. The period of work is 1,200 days.
Ballastless track is a concrete track bed instead of a stone ballast bed. It costs more to build and far less to maintain, which is why metros use it in tunnels and on viaducts. The work sits between civil and systems, so the bidder is usually a track specialist rather than a general road contractor.
No published value, a sizeable deposit
The portal lists the tender value as NA. EMD is ₹1,08,70,000 with no exemption, which indicates an estimate of about ₹54.35 crore if the deposit is 2 per cent. The tender fee is ₹23,600 and bids open at 03:00 PM on 29 December, a day after they close.
Track laying on a metro is a logistics exercise. Material has to reach the viaduct or tunnel face through a city, so the useful machines are small and precise: a pick-and-carry crane or rail-mounted gantry for panels and buffer stops, and transit mixers feeding the track bed pour in tightly controlled lifts.
Heavy earthmoving barely features. If you own excavators and tippers, the better fit in Patna is the city road and drainage work around the corridor rather than the track package itself. Bidders are judged on survey accuracy, welding and tolerance control over 1,200 days.
Key facts
Tender ID
2026_DMRC_934104_1
Reference no.
PT-05
Issuing authority
Delhi Metro Rail Corporation Limited, JICA tenders wing, for the Patna Metro Rail Project
Location
Corridor 01, Patna Metro Rail Project, Patna, Bihar (PIN 800001)
Estimated value
Not officially disclosed (about ₹54.35 crore if the EMD is 2 per cent)
Installation of ballastless track for Corridor 01 of the Patna Metro Rail Project, including supply of buffer stops and other permanent way items.
Who is inviting bids?
Delhi Metro Rail Corporation, through its JICA tenders wing, as the executing agency for the Patna Metro Rail Project.
What is the value?
The portal does not publish one. The EMD of ₹1,08,70,000 suggests about ₹54.35 crore at 2 per cent, so confirm the figure in the tender document.
How long is the contract?
1,200 days. Bids close at 03:00 PM on 28 December 2026 and open at 03:00 PM on 29 December 2026.
Tender details are summarised for convenience and may change. Always verify the latest dates, terms and documents on the official tendering portal before bidding. DesiMachines is not responsible for changes made by the issuing authority.
Bidding with your own machines?Tenders often ask for machine papers such as the RC, insurance and invoice. Keep them in one private place on My Machine and get a reminder before insurance or service falls due. Free.
Desi Machines is a platform where you can see and compare construction equipment. It showcases images, brochures, features, technical specifications, brand details & dealer information. All these are taken from respective brand websites, brochures, and other public resources. We do not claim ownership of these materials and strive to ensure their accuracy. However, the disparity may happen and we advise users to verify directly with respective brands and dealers. Desi Machines is not liable for any inaccuracies or reliance on the information provided. Use of this website is at your own discretion.