Jaspur Nagar Palika is getting a 6.50 MLD sewage treatment plant with sewer lines and five years of operation, and the ₹50.97 crore Jaspur STP tender closes at 5:00 PM on 25 November 2026.
Cleaning up the Lapakna river
The work description on the portal is a design, build, operate and transfer contract for pollution abatement on the Lapakna river. That means interception and diversion of the drains now discharging into it, one sewage treatment plant of 6.50 MLD capacity, a faecal sludge treatment facility able to handle 20 KLD, sewer lines and the appurtenant works, plus five years of operation and maintenance. The inviting authority is the Superintending Engineer, Construction Circle, Udham Singh Nagar, under the Managing Director of Uttarakhand Peyjal Nigam, reference 945/Nivida/21 dated 14 October 2026.
Interception and diversion jobs are messier than they sound on paper. The drains are already there and already flowing, and the contractor has to tap them and carry the flow to the plant while the town goes about its business.
Numbers that shape the bid
The estimate is ₹50,96,53,263. EMD is ₹83,00,000 with no exemption and the fee is ₹11,800. The portal gives 2,430 days, which covers construction and then the five operating years, and bids open at 3:00 PM on 26 November 2026. Treatment plant work needs a process partner, so firms without an STP record usually tie up with one before bidding.
Sewer laying is the bulk of the earthwork. Excavators open the trench and a backhoe loader works the house connections and the narrow lanes, with shoring and dewatering pumps on hand because the water table in the Tarai sits close to the surface. The plant itself is a concrete job for transit mixers, and a pick and carry crane sets the pumps, blowers and clarifier parts. Budget for road restoration behind the trench as well, because every lane you open has to be given back.
Interception and diversion of drains flowing into the Lapakna river, a 6.50 MLD sewage treatment plant with a 20 KLD faecal sludge treatment facility, sewer lines and appurtenant works, and five years of operation and maintenance under used water management for Jaspur Nagar Palika.
What is the estimated cost?
₹50.97 crore, shown on the portal as ₹50,96,53,263.
What is the contract period?
2,430 days on the portal, which covers construction followed by the five operating years.
When is the deadline?
Bids close at 5:00 PM on 25 November 2026 and open at 3:00 PM on 26 November 2026.
Tender details are summarised for convenience and may change. Always verify the latest dates, terms and documents on the official tendering portal before bidding. DesiMachines is not responsible for changes made by the issuing authority.
Bidding with your own machines?Tenders often ask for machine papers such as the RC, insurance and invoice. Keep them in one private place on My Machine and get a reminder before insurance or service falls due. Free.
Desi Machines is a platform where you can see and compare construction equipment. It showcases images, brochures, features, technical specifications, brand details & dealer information. All these are taken from respective brand websites, brochures, and other public resources. We do not claim ownership of these materials and strive to ensure their accuracy. However, the disparity may happen and we advise users to verify directly with respective brands and dealers. Desi Machines is not liable for any inaccuracies or reliance on the information provided. Use of this website is at your own discretion.