UP PWD is widening and strengthening the Jhala to Urra to Harkhapur other district road in Bahraich, with five years of maintenance attached, and the Bahraich road tender closes at 12:00 noon on 29 October 2026.
Five years of maintenance changes the bid
The work is widening and strengthening of the Jhala, Urra and Harkhapur road, an other district road in Balha assembly constituency of Bahraich district, with a five year maintenance obligation. Construction is priced at ₹26,00,00,000 over 360 days, and after that you carry the road for five more years.
That tail is the part bidders underprice. A thin ODR pavement in the Terai belt, with heavy monsoon and farm traffic, will need real spending in years three to five. Price the maintenance years on what the road will actually ask for, not on a token percentage.
Deposit, fee and timing
EMD is ₹39,00,000, about 1.5 per cent, and the tender fee is an oddly precise ₹12,154, which is normal on the UP portal where the fee is computed rather than rounded. Bids close at noon and open half an hour later the same day, so there is no gap to reconsider. The Superintending Engineer, Bahraich and Shravasti Circle, under the Chief Engineer, Devipatan Zone at Gonda, is the inviting authority, reference 3206/8 Kam/E-Tendering/BRH-SWT Circle/2026-27.
An ODR widening job is bread and butter for a local fleet owner. One excavator, a backhoe loader for culverts and side drains, three or four tippers, a motor grader and a pair of compactors will carry most of it, with a paver hired for the bituminous layers. Because the five year maintenance follows, machines that stay in the district earn more than machines that move on. The road construction equipment guide sets out what each layer needs.
Widening and strengthening of the Jhala, Urra and Harkhapur other district road in Balha constituency of Bahraich district, Uttar Pradesh, with a five year maintenance obligation after construction.
What is the value and EMD?
₹26,00,00,000, with an EMD of ₹39,00,000, about 1.5 per cent, and a tender fee of ₹12,154.
How long is the construction period?
360 days, followed by five years of maintenance under the same contract.
When do bids close and open?
Bids close at 12:00 noon on 29 October 2026 and open at 12:30 PM the same day.
Tender details are summarised for convenience and may change. Always verify the latest dates, terms and documents on the official tendering portal before bidding. DesiMachines is not responsible for changes made by the issuing authority.
Bidding with your own machines?Tenders often ask for machine papers such as the RC, insurance and invoice. Keep them in one private place on My Machine and get a reminder before insurance or service falls due. Free.
Desi Machines is a platform where you can see and compare construction equipment. It showcases images, brochures, features, technical specifications, brand details & dealer information. All these are taken from respective brand websites, brochures, and other public resources. We do not claim ownership of these materials and strive to ensure their accuracy. However, the disparity may happen and we advise users to verify directly with respective brands and dealers. Desi Machines is not liable for any inaccuracies or reliance on the information provided. Use of this website is at your own discretion.