Shree Cement onboarded 256 new suppliers through SAP Ariba in 2025-26, by its own Integrated Annual Report, and that invitation-led Ariba route is how Shree Cement vendor registration works today. There is no open sign-up form: the “Business With Us” link on shreecement.com leads to an old PP bag tender system that returned a 503 error on 19 November 2026. A new supplier first fills in an ESG self-assessment questionnaire and is screened against the Supplier Code of Conduct. For a machine owner, the door is the purchase or mines office of a Shree Cement unit, and no registration fee is published.
That leaves a hire firm, a mining contractor or a transporter with a practical question: which office to walk into, and what paperwork will be asked once the company shows interest. Shree Cement’s annual report, its ESG data book and its procurement policy answer most of it. This guide sets out what those documents say, read on 19 November 2026.
Is there a Shree Cement vendor registration portal?
Not one a new supplier can open. Under “Our Business” the website menu has a “Business With Us” link pointing to the Shree Tender System at sclepro.shreecement.com. From this side on 19 November 2026 the login page and its register page both returned a 503 (service unavailable) error.
Archived copies explain what that system was built for. The login page, saved in January 2023, is headed “SHREE CEMENT PP BAG TENDER” and offers Seller, Buyer and HOD logins. The sign-up form, saved in September 2019, asks for firm name, PAN, TIN, VAT, CST and excise numbers, “Plant Location With Address & Plant Capacity” and whether you already supply other cement companies. That is a form for cement bag manufacturers. The tax fields predate GST, and nothing in it fits an excavator owner or a haulage contractor.
The current system sits elsewhere. The annual report says Shree Cement runs “SAP Ariba-enabled sourcing and procurement workflows” and counts more than 4,600 auctions conducted through Ariba during 2025-26. No public Ariba registration link appears anywhere on shreecement.com, unlike the Adani group, whose sites carry an open Expression of Interest form (see the Adani vendor registration guide).
How Shree Cement vendor registration works, step by step
Shree Cement has not published a supplier onboarding manual. Pieced together from its own documents, the path looks like this.
| Step | What Shree Cement’s documents say | Source |
|---|---|---|
| Screening | Suppliers are screened on social and environmental parameters as part of onboarding, and classed as critical or non-critical by volume and how replaceable they are | Sustainable Procurement Policy, approved 28 August 2025 |
| Self-assessment | All new suppliers complete an ESG self-assessment questionnaire; a supplier engagement plan follows from the result | ESG Data Book FY 2025-26 |
| Onboarding | All new suppliers go through structured onboarding and a compliance check before entering procurement systems; 256 were onboarded through Ariba in 2025-26 | Integrated Annual Report 2025-26 |
| Contract | The Supplier Code of Conduct is written into contracts, purchase orders and agreements, and OHS clauses go into vendor contracts | ESG Data Book FY 2025-26 |
| Award | Preference goes to suppliers with stronger ESG performance; a supplier who ignores corrective actions can be excluded | ESG Data Book FY 2025-26 |
| Review | Desk or site assessments each year; 411 suppliers were desk-assessed in 2025-26 | ESG Data Book and annual report |
Read the Sustainable Procurement Policy and Supplier Code of Conduct before your first meeting. It runs to 4 pages, names the “Heads of Procurement Functions” as its owners, and says a supplier who fails to remediate a breach can be terminated or blacklisted.
What Shree Cement buys, and where machine work fits
The annual report puts the supplier base at 2,562 and procurement spend at Rs 6,264 crore for 2025-26. Both figures come with a narrow definition: they cover raw material, fuel, packaging bags and O&M spares, and the supplier count excludes traders. Only 26 suppliers, all in the O&M stores category, are classed as significant. The report does not say whether mining, civil or transport contractors sit inside these counts, so treat them as a picture of the materials side.
The contract side is large. The Business Responsibility and Sustainability Report (BRSR) counts 16,634 workers who are “other than permanent” against just 61 permanent workers. Most hands at the plants and mines therefore come through contractors. During the year, 28,268 contract workers attended 1,672 training programmes and 6,790 truck drivers were trained in 445 programmes.
Capacity explains the demand. Shree Cement reports 69.3 MTPA of cement capacity in India, including its wholly owned subsidiary Shree Cement East, with 6 integrated plant locations and 12 split grinding unit locations. Two integrated units came on stream in 2025-26: Jaitaran in Rajasthan and Kodla in Karnataka, each 3.65 MTPA of clinker. The board has also approved a new integrated plant at Daistong in Meghalaya’s East Jaintia Hills.
Limestone mines and new blocks: where the excavation work is
The report counts 8 operational limestone mines. In 2025-26 they produced 36.29 million tonnes of limestone and moved 19.07 million tonnes of overburden and interburden. It credits haul-road improvements, GPS-based movement systems and a crusher shifted downhill at one site with cutting diesel use by dumpers. A haulage contractor should expect those numbers to be tracked.
New mine work is visible in the BRSR’s list of environmental impact assessments, carried out under the EIA Notification of 14 September 2006 (S.O. 1533(E)). Five limestone projects appear.
| Limestone block | District, state | Production capacity |
|---|---|---|
| HPB19 Limestone Block (476.80 ha) | Nagaur, Rajasthan | 5.00 million tonnes |
| Sandi Limestone Block (404 ha) | Khairagarh-Chhuikhadan-Gandai, Chhattisgarh | 3.64 MTPA |
| Mohra (Block-A) Limestone Block (127.05 ha) | Balodabazar-Bhatapara, Chhattisgarh | 1.5 MTPA |
| Kondhala Limestone Block (105 ha) | Chandrapur, Maharashtra | 2.25 MTPA |
| Kachavaram Limestone Mine expansion (283.59 ha) | Palnadu, Andhra Pradesh | 3.6 to 7.2 MTPA |
A block with a fresh EIA is a block heading towards mine development, haul roads and overburden removal. Those are the jobs worth asking about early at the nearest unit. Live mining and plant work from other buyers is also listed on opportunities for machine owners.
For limestone loading into dumpers, the 35 to 38-tonne class is the usual hire size. The JCB 385LC Quarry Master weighs 37,733 kg with a 284 HP engine and a 1.4 to 1.6 cubic metre bucket, at around Rs 1.19-1.31 crore (indicative, as of Nov 2026). The Tata Hitachi ZAXIS 370LCH Ultra weighs 35,700 kg with 254 HP and a 1.3 to 2.5 cubic metre bucket range, at around Rs 1.14-1.26 crore (indicative, as of Nov 2026). Specs are as listed in November 2026. Match the bucket to the dumper size the mine runs before you quote a rate.
What the supplier code asks of a contractor
The Supplier Code of Conduct covers labour and human rights, health and safety, ethics, environment and product quality. Several lines bite on a machine-hire or mining contractor directly. No forced or child labour. Wages paid fairly and as per law, with working hours and overtime inside the rules. Safety equipment, fire safety and first aid at the workplace, and safety training for every worker. Tell Shree Cement if any of its staff has a financial interest in your firm.
The BRSR adds the checks that follow. It says the relevant departments verify, through documents, that value chain partners deduct and deposit statutory dues on time. It also says 93.28% of value chain partners by value were assessed on health and safety practices and working conditions in 2025-26. Keep PF and ESI challans, wage registers, the labour licence and operator training records in one file, because those are what such checks look at.
Worker training listed in the BRSR includes HEMM (heavy earth-moving machinery) operation and maintenance. An operator with a valid licence and a training record is easier to clear through a plant’s safety induction.
Payment days and MSME status
The BRSR gives 33.33 days of accounts payable for 2025-26, up from 31.12 days the year before. That is a company-wide average across all procurement, and a fleet owner should still plan diesel and operator wages for a longer gap on the first few bills.
Udyam registration is worth holding. Micro and small enterprises supplied 21.18% of Shree Cement’s input material by value in 2025-26 (20.38% a year earlier), and the procurement policy says onboarding should consider suppliers from the local area. For a micro or small supplier, Section 15 of the Micro, Small and Medium Enterprises Development Act, 2006 caps the agreed payment period at 45 days from acceptance. If a contract needs one more machine than you own, price the equipment finance EMI against the monthly hire you expect before you commit.
Fees, fraud alerts and where to raise a complaint
No fee for supplier onboarding is published anywhere on shreecement.com. The contact page carries a fraud alert: the company does not sell through unsolicited calls, WhatsApp messages or emails, and people misusing its name, logo and GST number have asked for advance payments into unknown bank accounts. The careers page separately says Shree Cement takes no money from job applicants. Apply the same rule to anyone offering a paid “vendor code”.
The Stakeholder Engagement Policy names a grievance mailbox for complaints, and the HR and CSR staff at each location also take them. The registered office is at Bangur Nagar, Beawar, Rajasthan. For how this compares with the largest cement maker, read the UltraTech vendor registration guide, and the full list of plant owners in cement companies in India.
Before you visit a Shree Cement mine office, compare excavator models and prices in the 35 to 38-tonne class so your quote matches the bucket the pit needs.
Facts come from Shree Cement’s website (menu, contact page fraud alert and careers notice), archived copies of the Shree Tender System pages (2019 and 2023), the Sustainable Procurement Policy with Supplier Code of Conduct (version 02), the Stakeholder Engagement Policy, the ESG Data Book FY 2025-26 and the Integrated Annual Report 2025-26, as read on 19 November 2026. Machine prices are indicative and vary by variant, location and date. Portals, policies and supplier terms change. Confirm the current process with Shree Cement’s procurement team at the unit before you apply or quote. DesiMachines is not liable for decisions taken on information that may have changed after publication.


