The Airports Authority of India is building a new domestic terminal, an ATC tower cum technical block, a fire station and an electrical and mechanical workshop at Warangal under one ₹213.59 crore EPC contract, and the Warangal airport tender closes at 6:00 PM on 10 November 2026.
Four buildings and the works between them
The scope is the development of Warangal Airport, specifically construction of the new domestic terminal building, the ATC tower cum technical block, the fire station, the electrical and mechanical workshop and associated miscellaneous works. The Engineering Civil wing at AAI corporate headquarters is inviting the bids, reference AAI/ENGG/ED-SR/WARANGAL/TB ATC.
Warangal has had an airstrip for decades without scheduled flights. This package is the terminal side of bringing it into service, which means the contractor works to aviation standards on a live airside boundary even though none of the buildings sit on the runway itself.
A low fee against a serious deposit
The estimate is ₹2,13,59,00,000 with an EMD of ₹6,41,00,000 and no exemption allowed, which is about 3 per cent and higher than most building contracts ask. The tender fee is only ₹11,800. The portal leaves the period of work blank, so the construction timeline has to be read off the EPC document.
An ATC tower is a slim tall structure that needs a crane standing for months, and a terminal building is a wide shallow one with long-span roof steel. Both run on steady concrete, so transit mixers and a pump matter more than raw digging capacity.
Foundations, the apron side works and the service runs bring in excavators and backhoe loaders, with compactors on the access roads and parking. Working near an operational airside means height restrictions on booms, escorted movements and daily plant clearance, so machines get committed to the site rather than shuttled between jobs. That suits owners who prefer a long single deployment to short hires.
Key facts
Tender ID
2026_AAI_290498_1
Reference no.
AAI/ENGG/ED-SR/WARANGAL/TB ATC
Issuing authority
Airports Authority of India, Corporate Headquarters, Engineering Civil
Construction of the new domestic terminal building, the ATC tower cum technical block, the fire station, the electrical and mechanical workshop and associated miscellaneous works at Warangal Airport.
What is the estimated value?
₹213.59 crore, shown as ₹2,13,59,00,000 on the portal.
How much is the EMD?
₹6,41,00,000 with no exemption allowed, which is about 3 per cent of the estimate. The tender fee is ₹11,800.
What is the completion period?
The portal does not state it. Take the construction period from the EPC document. Bids close at 6:00 PM on 10 November 2026.
Tender details are summarised for convenience and may change. Always verify the latest dates, terms and documents on the official tendering portal before bidding. DesiMachines is not responsible for changes made by the issuing authority.
Bidding with your own machines?Tenders often ask for machine papers such as the RC, insurance and invoice. Keep them in one private place on My Machine and get a reminder before insurance or service falls due. Free.
Desi Machines is a platform where you can see and compare construction equipment. It showcases images, brochures, features, technical specifications, brand details & dealer information. All these are taken from respective brand websites, brochures, and other public resources. We do not claim ownership of these materials and strive to ensure their accuracy. However, the disparity may happen and we advise users to verify directly with respective brands and dealers. Desi Machines is not liable for any inaccuracies or reliance on the information provided. Use of this website is at your own discretion.