Delhi Metro Rail Corporation has opened the Rithala Kundli metro tender, a ₹695.20 crore package for 11.3 km of elevated viaduct and ten stations on Phase-IV, closing 12 October 2026.
Eleven kilometres from chainage zero
The scope runs from chainage 0 metre to 11299.093 metre of the Rithala to Kundli corridor, which is the northern extension of Delhi Metro Phase-IV. Within that stretch the contractor part designs and builds the elevated viaduct, the integrated depot despatch structure including its ramp, and ten elevated stations. This is the first of the corridor’s construction packages to reach the market, and it is tendered under the JICA funded stream, so the procurement conditions follow that lending framework rather than DMRC’s ordinary domestic template.
Something worth reading carefully: the header on the bid notice bands the value at ₹500 crore and above, while the tender’s own summary states ₹695.20 crore. The earnest money deposit of ₹13,90,40,000 settles it, because that is exactly 2 per cent of ₹695.20 crore to the rupee. Two independent figures agreeing that precisely is not a coincidence, so treat ₹695.20 crore as the working estimate and confirm it against the priced bill of quantities in the document set.
The bidder this suits
Ten elevated stations and 11.3 km of viaduct is a two to three year programme for a contractor with metro or elevated corridor experience. Bid validity is 120 days, shorter than the 180 days DMRC often runs, and withdrawal is permitted, which is unusual and gives a bidder some room. The tender fee is a modest ₹23,600 and payment mode is offline. Bids are opened at Metro Bhawan.
The timeline has a long gap built into it. The notice went up on 25 August 2026 but submission does not open until 6 October and closes 12 October, with opening the next day. That gives roughly six weeks to price the job and assemble a consortium, which on a package of this size is time you will use.
Machines that earn on an elevated corridor
Piling rigs and rotary drills for the viaduct foundations, then crawler cranes and launching girders to place pier caps and precast segments. A casting yard needs its own gantry cranes and transporters. Excavators and tippers clear pile spoil and shift material for the depot despatch structure and its ramp. Batching plants, transit mixers and concrete pumps run more or less continuously. Station boxes add tower cranes and passenger hoists once the structure rises, and soil compactors finish the approaches and the depot hardstanding.
Key facts
| Tender ID |
2026_DMRC_923487_1 |
| Reference no. |
D2C-04 |
| Issuing authority |
Delhi Metro Rail Corporation Limited, JICA Tenders (Senior General Manager Contract) |
| Location |
Rithala to Kundli corridor, Phase-IV, Delhi |
| Estimated value |
₹695.20 crore (listed on the notice as ₹500 crore and above; the stated figure is corroborated by an EMD of exactly 2 per cent) |
| EMD |
₹13,90,40,000 |
| Tender fee |
₹23,600 |
| Form of contract |
Works, two cover system |
| Published |
25 August 2026 |
| Bids close |
12 October 2026 (submission opens 6 October 2026) |
| Bid opening |
13 October 2026, Metro Bhawan |
| Completion period |
Not specified. |
| Official portal |
Central Public Procurement Portal |
How to apply
- Open the official portal: Central Public Procurement Portal.
- Search by tender ID 2026_DMRC_923487_1 (reference no. D2C-04) under Delhi Metro Rail Corporation Limited.
- Register on the portal and keep a valid Class III digital signature certificate ready.
- Download the NIT, the three tender parts and the bill of quantities, then check eligibility, the ₹13,90,40,000 EMD and the ₹23,600 tender fee. Note that payment mode is offline.
- Submit your bid online between 6 October 2026 and 12 October 2026. Bid validity is 120 days.
More on DesiMachines
Viaduct packages live on foundation and lifting plant. Browse cranes, excavators, concrete mixers and compactors, and see how contractors finance plant for a job running several years.
Two related packages are open alongside this one. The ₹1,373.36 crore DMRC Phase-IV viaduct tender is the larger sibling package on the same phase, and the Kolkata metro viaduct tender covers comparable elevated work in West Bengal.
See more live tenders in Delhi, or browse all live tenders.
FAQ
What does the Rithala Kundli metro tender build?
Part design and construction of the elevated viaduct, the integrated depot despatch structure including its ramp, and ten elevated stations from chainage 0 metre to 11299.093 metre of the Rithala to Kundli corridor on Phase-IV of the Delhi MRTS.
Why do two different values appear for this tender?
The bid notice bands the estimate at ₹500 crore and above while the tender summary states ₹695.20 crore. The earnest money deposit of ₹13,90,40,000 is exactly 2 per cent of ₹695.20 crore, which corroborates the stated figure. Confirm it against the priced bill of quantities before bidding.
How is this different from the other DMRC Phase-IV viaduct tender?
They are separate packages. This one is reference D2C-04 on the Rithala to Kundli corridor at ₹695.20 crore closing 12 October. The other covers elevated and at-grade viaduct with sidings at ₹1,373.36 crore and closes 14 September.
Can a bid be withdrawn after submission?
Yes. Withdrawal is allowed on this tender and bid validity is 120 days, both of which differ from the 180 day non-withdrawable terms DMRC often applies.